Joined
·
1,074 Posts
A few more things done in the last two days.
1. a brutal install of running boards-it poured rain all day.
2. Bed and big shelf get carpeted and a bit of trim, more trim needed
but the overall 'look' can be seen.
3. Batteries/box and inverter-charger are set (not in stone but drastically narrowed
down and the one-ought cables attached. And the cable to the van battery has
been run.
Most importantly our PM gets a name- 'Hiyo Silver (away)'
1. a brutal install of running boards-it poured rain all day.
2. Bed and big shelf get carpeted and a bit of trim, more trim needed
but the overall 'look' can be seen.
3. Batteries/box and inverter-charger are set (not in stone but drastically narrowed
down and the one-ought cables attached. And the cable to the van battery has
been run.
Most importantly our PM gets a name- 'Hiyo Silver (away)'
Attachments
-
179.8 KB Views: 111
-
428.4 KB Views: 115
-
360.4 KB Views: 109